UoB Aston Webb B Block Office refurbishment

Client: University of Birmingham Programme: 8 weeks Value: £400,000 General Refurbishment of B Block at Aston Webb Building to create Staff Hub. Works involved the demolition and removal of existing furniture and partitions, as well as removal of existing ceilings and flooring. Full lighting re-design and installation was carried out, along with the supply and installation of new flooring, ceiling baffles, bespoke joinery, breakout are and furniture....

UoB Chamberlain House

Client: University of Birmingham Programme: 5 weeks Value: £60,000 Refurbishment of two floors at Chamberlain Halls on The Vale at The University of Birmingham. The project involved M&E alterations and the formation of a new kitchen area for student and staff use. Bespoke joinery and specialist furniture were then installed and all areas decorated to create a fresh new front facing space for The Vale to use....

PricewaterhouseCoopers LLP Watford Office

Client: PricewaterhouseCoopers LLP (PwC) Programme: 12-week contract + 6 for additional works Value: £1.6 Million Category B office fitout of Levels 2-4. Works comprised of new meeting rooms, new open plan office space, bespoke meeting pods, IT Equipment and Build Rooms, Refreshment areas (bespoke kitchens), Welfare areas, glazed lobbies, new flooring, tiling, MEP reconfigurations and high-end installations with feature lighting, detailed acoustic works throughout, folding walls, firestopping and bespoke finishing throughout....

QE Hospital, Birmingham A&E Works – Phase 1

Client: NHS Programme: 6 weeks Value: £300,000 Works to install new sliding flow-motion glazed door system to cubicle bays in a live 24hr A&E department. Works consisted over new Temporary hoarding, Steelwork frames, ceilings and bulkhead alteration, new curtain rails and M&E alterations to suit. Works were carried out over 16 different phases working 7 days a week to enable to A&E department to stay fully functional...

Price Water House Cooper

PricewaterhouseCoopers LLP, Chamberlain Square, Paradise, Birmingham

Value: £1.2 Million Client: PricewaterhouseCoopers LLP (PwC) Programme: 9 weeks Cat B Commercial fit-out of the 2nd floor at 1 Chamberlain Square, Birmingham. Works consisted of installations of partitions to form new rooms, creation of an SER room for IT, new refreshment area, new acoustic finishes, new floor finishes throughout, ceiling adaptations, M&E adaptations, storage facilities, bespoke joinery, breakout areas and meeting pods....

uob-greenheart-thumbnail

The University of Birmingham; Greenheart Café

Client: University of Birmingham Programme: 11 weeks Value: £600K The interior fit of the café shell was completed as part of the Green Heart at the University of Birmingham. The works involved the full MEP design and installation, including working with the clients catering contractors. Bespoke, feature timberwork ceilings and walls were designed and installed, together with ceramic tiled flooring, and vinyl flooring to the kitchen and back of house area. Feature wall linings incorporating the clients Interior Designers visuals finished this project to a very high standard, on time, and within budget with no snags....

bt-bourton-thumbnail

British Telecom; Burton Offices

Client: BT / Mainline Programme: 4 weeks Value: £100,000.00 Internal refurbishment works to the first-floor office accommodation at Willow House for BT Mainline.The project consisted of refurbishing the whole 1st floor area to enable occupation by a new tenant. The finishes were designed by an interior designer and featured bespoke details. The comprehensive refurbishment involved power modifications, new kitchen, new solid and glazed partitioning, new flooring, modifications to the lighting, fire alarm and ventilation systems, new timber cladding and bespoke acoustic screens....

GTH-Frankland-thumbnail

The University of Birmingham;
The Frankland Building Music Facility

Client: University of Birmingham, Estates. Programme: 56 weeks Value: £8.5 Million Full refurbishment of an early 1900’s building, ‘The Frankland Building’ to create music and teaching spaces with ancillary office spaces throughout, along with staff and student break out areas. Also included in the scheme was the demolition and re-construction of a single storey Annex building which was linked to the existing building. The Annex consisted of music rooms, recording studios and office space with kitchenette. Works to the existing building comprise of full strip out, new MEP installations, walls, partitions, floor finishes and specialist acoustic fit-out to the ground and first floors. The building also received a new passenger lift and new windows on the 4th floor North and South elevations. ...

British-Telecom-Project-aquarius-thumbnail

British Telecom – Project Aquarius;
Birmingham Business Park

Client: BT Programme: 6 weeks Value: £230,000.00 1st Floor Refurbishment - Aquarius Building, Birmingham Business Park. Partial fitout of the 1st floor carried out in two phases, to enable the client to take partial occupation of one wing of the floor. Fast track programme works including power and containment, lighting, HVAC, Partitions, new kitchen and tea point, ceilings, flooring, decorations....

Birmingham City University;
University House

Value: £2m Sector: Education The project involved working on floor levels 1, 2, 3 and 4 of the University House. The scope was for a full refit to be carried out in an existing building whilst the ground floor remained occupied. The works were carried out over 4 floors and included the construction of meeting rooms on floors 1, 2 and 3 together with a suite of offices and a boardroom on the 4th level for the universities Directorate. New wall, floor and ceiling finishes were completed throughout. Electrical and IT works included the installation of a new Cat 6 data network, alterations to the existing controlled access system, modifications to the existing lift saving systems, small power and lighting alterations. Mechanically adaptations were carried out to the existing venting systems, installation of new air conditioning to all meeting rooms and the refurbishment of all WC's within the building....